Soil evaluation
The percolation rate is the single number that decides system type, bed area and most of the price. It is measured on your site, in your soil, and it cannot be inferred from the neighbours.
What the test actually measures
A percolation test times how quickly water drops in a pre-soaked hole, which gives the rate the bed has to be designed around. On its own that number is not enough, because a fast rate over shallow bedrock or a high water table is misleading: the water leaves the hole but has nowhere safe to go.
So test pits are dug alongside, deep enough to read the soil horizons, identify mottling that shows where the water table seasonally rises, and find rock if it is there. Those three findings together are what a designer needs for the permit drawings.
Where the results rule out a conventional bed, they also point at the alternative, usually a raised bed with imported fill or an aerobic treatment unit. Either way you learn it before committing to a build, not during one.
How it works
Pits sited where the bed could actually go, including a reserve area, rather than wherever the machine can reach.
Horizons recorded by depth and texture, mottling noted, and depth to rock or water table measured where present.
Holes pre-soaked so the reading reflects saturated conditions, then the drop timed over repeated intervals.
A written result with the pit logs, in the form the permit application needs, plus what it means for system type.
Why the season matters
Soil that drains beautifully in a dry August can sit saturated in April, and a bed designed on the August number will fail every spring, showing the usual failure signs within a few years. That is why pit logs record mottling: the colour change left by seasonal saturation tells you where the water table reaches even when it is not there on the day.
It is also why we will say when a result is weaker than it looks and should be re-checked in a wetter month. A cheap test in the wrong month is the most expensive thing on a septic project, because the bed built on it is the part that cannot be repaired.
Buyers should note that a perc test is not part of a standard property inspection. If a lot is being bought to build on, this is the test that determines whether it can be, and it belongs alongside the septic inspection.
Installation services
From a single tank swap to a full build on a difficult site.
Full builds from soil evaluation through permit and final grading.
Learn moreSwapping a failed tank while keeping a sound bed.
Learn moreTank and bed together when the system has reached the end.
Learn moreThe test pits and rate that decide what the site can take.
Learn moreSizing, drawings and the application filed on your behalf.
Learn moreFor tight lots and poor soil where a conventional bed will not fit.
Learn moreWhat drives replacement pricing, and by how much.
Learn moreCommon questions
For buyers, builders and anyone facing a replacement.
Perc test done in two visits with the holes soaked overnight like the code requires. The result was written up and accepted by the township.
They dug test pits and showed me the soil layers with a tape. I understood why the design needed a raised bed before the quote arrived.
Soil evaluation for a lot we were thinking of buying. The report told us it would need a mound system, which changed the offer.
Fast turnaround on the perc report, and the tech explained the numbers rather than just handing over a form.
Next step
Test pits and a measured rate, in a report the permit application can use, before anybody quotes you an excavation.
Pits sited where the bed goes · Horizons logged · Permit-ready report