Commercial and Grease
Get in Touch
Resources
Installation
What a site can take is decided by its soil, not by what the owner would prefer. Every install here starts with test pits and a percolation rate, because that number sets the size, the type and the price of everything after.
What decides the price
Two houses on the same street can need systems that differ by tens of thousands. Sandy loam that drains freely takes a modest conventional bed. Heavy clay, a high water table or shallow bedrock forces a raised bed, imported fill or an aerobic treatment unit, and each of those changes the number substantially.
That is why the perc test comes before the quote rather than after. Anyone who prices a full system over the phone is pricing a guess, and the difference lands on you at the point where the excavator is already on site.
Once the rate is known, sizing follows from bedroom count and daily flow, and the drawings go in for permit. Ranges for each system type are set out on septic system cost, and if the existing tank is sound the job may only be a field replacement.
How it works
Pits opened, horizons logged and a percolation rate measured, which sets everything downstream.
Sizing from bedroom count and flow, drawings prepared, and the permit application filed for you.
Tank set and levelled, lines laid to fall, bed built to the approved drawing, with risers to grade.
Open-trench inspection, backfill, final grading and seeding, with the approved paperwork handed over.
Installation services
From a single tank swap to a full system on a difficult site.
Full builds from soil evaluation through permit, install and final grading.
Learn moreSwapping a cracked, collapsed or undersized tank while keeping a sound field.
Learn moreTank and field together when the existing system has reached the end.
Learn moreTest pits and percolation rates that decide what the site can actually take.
Learn moreSizing, drawings and the permit application filed on your behalf.
Learn moreATU installs for tight lots and poor soil where a conventional bed will not fit.
Learn moreCommon questions
Asked by owners planning a replacement or building new.
They tested the soil before quoting, which two other companies skipped. Their design was the only one the township approved without changes.
Every step was explained and photographed: pits, tank set, trenches, gravel, fabric. The photos went into the permit file.
The crew showed up when they said, finished when they said, and the final inspection passed on the first visit.
They installed, then came back at six weeks to check settlement and adjust a lid. No charge, and I did not have to ask.
Next step
Start with the soil. Test pits and a percolation rate give you a real number for the system your site can actually take, in writing.
Soil evaluation first · Permit filed for you · Final grading included