Commercial and Grease
Get in Touch
Resources
About us
Most of what goes wrong with a septic system is preventable, and most of what gets quoted as a replacement is something smaller. Both of those come down to whether anybody actually looked.
What we are trying not to be
The pattern that does the most damage in this trade is a replacement quoted from the driveway. Surfacing water and slow drains have several possible causes that differ in price by a factor of twenty, and telling them apart takes an hour with the tank and the distribution box open.
So the rule here is that the cheap causes get ruled out first, in order: effluent filter, outlet tee, then the distribution box. The bed is the last suspect, not the first.
The second rule is that readings get written down. Two sludge depths a few years apart replace a guessed interval with a calculated one, which is the single thing that most reliably keeps a bed alive.
How it works
Sludge and scum against the liquid level, on arrival and again after, both written on the invoice.
Inlet, outlet, filter and where reachable the distribution box, because they are only visible when the tank is empty.
Labour, disposal and any digging itemised separately, so a total never hides a surprise.
Disposal receipt, the readings, and a recommended next date based on your own accumulation rate.
What we will tell you not to buy
Additives do not remove sludge and some make things worse. Rejuvenation does nothing for a bed whose soil is already blinded, which is why we probe before offering it on drain field rejuvenation. A service contract adds little on a straightforward gravity system owned by somebody who will remember.
Saying so costs us work in the short run and is the only way this job makes sense over a longer one. A customer who was told plainly that their tank was not due yet tends to call back when it is.
Where we do think something is worth doing, the reasoning is on the page rather than in a sales conversation: see what things cost and how intervals are worked out.
What we do
Grouped by the job rather than the part.
Routine and emergency pump outs with depths recorded.
Learn moreAnnual, pre-purchase, camera and dye, with written reports.
Learn moreSoil evaluation, design, permits and the build itself.
Learn moreBaffles, tees, boxes, pumps, risers and blockages.
Learn moreDiagnosis, partial repair and full replacement.
Learn moreKitchens, lift stations and multi-site routes.
Learn moreCommon questions
Before you call, if you would rather know first.
First company that opened the lid before talking price. The crew measured sludge depth, wrote it on the ticket, and the number decided the plan, not the sales pitch.
Sent them a photo of a soggy patch and got a straight answer: come look before anyone quotes a new bed. They came, found a broken pipe, and the bed was fine.
The tech told me my tank was not due yet and left without pumping. Hard to find a company that will pass up a job because the reading said so.
Every visit ends with a sheet: depths, gallons, what they saw in the outlet. Three years of those sheets is how we planned the replacement calmly.
Next step
Whether it is a scheduled pump out or a quote you want a second opinion on, the first step is the same: somebody looks before anybody prices.
Measured before quoted · Written prices · Second opinions welcome