Nothing about a new system is decided in a catalogue. Test pits and a percolation rate decide the type, the size and most of the price, which is why the soil work happens before the quote rather than after it.
Why the soil comes first
Sandy loam that drains freely takes a modest conventional bed. Heavy clay, a high water table or shallow bedrock forces a raised bed, imported fill or an aerobic treatment unit, and each of those changes the number substantially.
None of that is visible from the driveway, which is why a perc test comes before the quote. Anyone pricing a full system over the phone is pricing the worst case and hoping, or the best case and coming back to you later.
Once the rate is known, sizing follows from bedroom count and daily design flow, the drawings go in for permit, and the excavation is the last step rather than the first. Ranges by system type are on septic system cost.
How it works
Pits opened, soil horizons logged, water table noted and a percolation rate measured. Everything else follows from this.
Sizing from bedrooms and design flow, drawings prepared, and the application filed and tracked on your behalf.
Tank set and levelled, lines laid to fall, bed built to the approved drawing, with risers brought to grade.
Open-trench inspection passed, then backfill, final grading and seeding, with the approved paperwork handed over.
What the quote covers
A full system quote covers the soil work, the design, the permit fee and tracking, the tank and its risers, the distribution network, the bed itself, any imported fill, the excavation and backfill, and the final grade and seed. The parts people forget are fill and restoration, and on a difficult site fill alone can be a significant line.
Access matters too. A machine that cannot reach the bed area without crossing a driveway or removing a fence adds cost, and that is identified at survey rather than discovered on day one. Mature trees inside the bed footprint cannot stay, and we mark that out before anyone signs.
Once it is in, the system is only as good as its maintenance, and the first pumping interval is set from the design flow until real readings replace it. Risers fitted at build time mean every later visit is a lift rather than a dig.
Installation services
From a single tank swap to a full build on a difficult site.
Full builds from soil evaluation through permit and final grading.
Learn moreSwapping a failed tank while keeping a sound bed.
Learn moreTank and bed together when the system has reached the end.
Learn moreThe test pits and rate that decide what the site can take.
Learn moreSizing, drawings and the application filed on your behalf.
Learn moreFor tight lots and poor soil where a conventional bed will not fit.
Learn moreWhat drives replacement pricing, and by how much.
Learn moreCommon questions
For owners building, or replacing something beyond repair.
New build on clay. They did the soil work, designed a bed that fit the lot and had the permit before the foundation was poured.
Whole system in a week: tank set, bed dug, inspection passed, yard graded. The inspector said the trenches were the cleanest he had seen that month.
They coordinated with our builder on the plumbing stub-out so the tank sat exactly where the drawings said. No extra pipe, no surprises.
The system came with an as-built drawing showing lid locations and the field boundary. That drawing is now taped inside the utility closet.
Next step
Test pits and a percolation rate give you a real number for the system your site can actually take, before anyone quotes an excavation.
Soil evaluation first · Permit filed for you · Final grading included